24-hour hotline: 15731712381

 Englishimage.png 中文



How to deburr casing?

ADD TIME: 2024-06-07

CLICK COUNT: 48

Slide the oil casing to the deburring process and remove the external thread protection devices on both sides; use compressed gas to blow out the iron slag in the oil casing;

1-210S014562J00.jpg

Turn on the air source switch of the deburring equipment, check whether the tool is long enough and sharp; turn on the axial movement switch of the tool bar, and when the tool is inserted into the pipe body, shake the air motor switch to make the tool run at high speed immediately, and then adjust the axial movement speed of the tool (usually 0.7-1 meter per minute) until the tool passes through all the holes in the wall thickness, reverse the axial movement switch of the tool bar to make the tool retreat until the air motor switch exposes the end of the casing, and immediately turn off the air motor. The tool is still moving axially. When it reaches the starting position, turn the axial movement switch of the tool bar to the end position;

photobank (18).jpg

Use compressed gas to blow out the iron slag in the pipe body, and use a flashlight to observe whether the burrs in the inner cavity are cleaned up. If it is confirmed that the burrs are removed, go to the next process. If not, it is necessary to adjust the CNC tool or the axial movement speed and repeat the above steps until the burrs are removed; install the external thread protection devices on both sides; after filling in the relevant records, the oil screen pipe deburring process in the oil casing process is completed.



  Product center

Product introduction
Performance advantage
Technical parameters
Application field

Technical support


Application solution
Equipment maintenance knowledge


About us


Company profile
Development course
news


Contact us


Telephone: 0086-15132768866
Email address: qml@partnertj.com

Address: Room 027, 1st Floor, Gate 8-9, Building 5, Xinjiayuan Commercial Plaza, Beitang Street, Binhai New District, Tianjin.